New Page 1
|
 |
| |
|
|
Overview |
| |
|
Panelization is done indoors with added efficiency of computer automation and
quality control by state-of-the-art wall tables, production saws, automatic
nailguns, forklifts, etc. This technique allows for large volume lumber,
sheathing, window and door purchases to be made at significant cost savings
compared to materials purchased for individual "site-framed" homes. Plus, by
panelizing indoors, kiln-dried lumber remains dry, instead of being exposed to
the elements.
|
| |
|
Panelization
enables the builder to enclose the home much faster than
conventional construction, protecting the materials
from weather and theft. |
|
|
|
| |
|
What are Panels? |
 |
| |
|
Panelized Homes are built inside
climate-controlled factories. Panels are made for walls and sometimes floors, and our
panelization package includes roof and floor trusses. Jigs and frames are used to ensure
the accuracy of the panels, and computers guide the saws as they cut the boards. Lumber is
stored inside, away from the elements - no rain or snow to cause the boards to warp.
When the foundation of the home is
ready, panels are trucked to the site. A crane hoists the panels into place and they are
bolted or strapped to the foundation, like a traditional "site-built" wall. Roof
trusses are placed & covered with sheathing. |
|
|
|
Why Panelize?
|
 |
| |
|
Placing panels and closing in the
house takes less than 1 week, an advantage over the 10 day to 3 weeks it can take to
enclose a home built using traditional methods. There's less exposure to the elements and
less material theft, which can account for an increase of 10% in the price of a site-built
house. The reduced framing time also means the house is finished and ready to move into
sooner.
The National Association of Home
Builders and the Wood Truss Council of America erected two 2600-square foot homes side by
side for comparison. One used trusses & wall panels as components, and the other was
built with traditional frame construction. The component home saved 16% more than the
stick-built home in total labor and material costs.
It is predicted that within the
next 10 years, about 80% of residential construction will involve panelization.
*Cecon Construction's Custom Home
Packages include your panelization package, but if our clients prefer the traditional
methods to be used, our team can surely accommodate them.
Steps
of Panelizing |
|
|
 |
| |
|
|
| |
 |
| |
 |
|
|
© 2004 Cestone Custom Homes, all
rights reserved |
|
| |
|
|